Run of show template for offsites and sales kickoffs

Read with AI
Read with Claude Read with ChatGPT

Build the run of show from the agenda, give every row one named owner, make buffers and room flips real rows, and lock one dated version two or three days out.

Most offsites and sales kickoffs do not slip during the sessions. They slip in the gaps: the room flip, the coach that waits, the lunch that lands late.

A run of show template closes those gaps. It is the crew's minute-by-minute version of the agenda, with one row for every moment that needs someone to act.

The common mistake is to send the attendee agenda to the venue and the AV team as is.

But the agenda tells people where to be. The run of show tells the crew what to do, who does it and what happens if it goes wrong.

In this guide, we'll show you a copyable sheet, two filled examples, who gets which document and when to lock it.

You stay the owner of the plan. A local event planner can build and run the sheet with you if this is your first one.

The short answer: build the run of show from the agenda, give every row one named owner, make buffers and room flips real rows, and lock one dated version two or three days out.

  • One row per moment that needs an action, not one row per session.
  • One named owner per row. A team name is not an owner.
  • Buffers, transfers and room resets get their own rows and times.
  • Attendees get the agenda; the crew, venue and event planner get the run of show; the AV desk gets the cue sheet.
  • Draft about a month out, lock two or three days before, and let one show caller run it on the day.
  • Lois Sarfo-Mensah, founder of 3 Pillars Co.
  • Britta Mohrman, CMP, owner of 316 Meeting & Event Co
  • Carri Farrand Clemens, Owner/Founder of A Closer Look Events
  • Andrea Dasent

Asked to run the offsite? Get a run of show built by a local planner

No event experience needed. Share your dates, headcount and agenda. A local planner turns it into venues, timings and a run of show, at local prices, in a proposal reviewed by Vantly before you see it

Free, personalized initial proposal within 48 hours. No commitment.

What a run of show is, and how it differs from the agenda

A run of show is the crew's working timeline: every cue, transition and handoff, with a time, a place and an owner.

The agenda is the promise to attendees. The run of show is how the crew keeps it, down to who opens the doors and who cues the walk-in music.

Most events end up with four documents. Keeping them separate stops attendees from seeing crew notes and stops the crew from working off a pretty agenda.

Who reads it

Agenda
Attendees and leadership
Itinerary
Attendees who travel
Run of show
Crew, venue, event planner, facilitators
Cue sheet
AV desk only

What it holds

Agenda
Sessions, meals, start and end times, dress code
Itinerary
Flights, transfers, hotel, check-in, meeting points
Run of show
Every cue, transition, owner, backup and status
Cue sheet
Mic, slide, video, lighting and music cues

Level of detail

Agenda
Blocks of 30 to 90 minutes
Itinerary
Per person or per group
Run of show
Minutes, one row per action
Cue sheet
Seconds, keyed to the run of show
View full comparison table

Scroll sideways to compare all options →

Which document for whom, checked on November 19, 2026
DocumentWho reads itWhat it holdsLevel of detail
AgendaAttendees and leadershipSessions, meals, start and end times, dress codeBlocks of 30 to 90 minutes
ItineraryAttendees who travelFlights, transfers, hotel, check-in, meeting pointsPer person or per group
Run of showCrew, venue, event planner, facilitatorsEvery cue, transition, owner, backup and statusMinutes, one row per action
Cue sheetAV desk onlyMic, slide, video, lighting and music cuesSeconds, keyed to the run of show

If you still need the attendee side, start with the offsite agenda template and build this sheet from it.

The run of show template (copy this sheet)

Use ten columns: time, duration, segment, location, what happens, owner, AV and materials, cue, backup and status.

Select the table below and paste it into Google Sheets or Excel. The columns carry over, and you can delete rows you do not need.

Duration

7:00 AM
30 min

Segment

7:00 AM
Crew call

Location

7:00 AM
Main room

What happens

7:00 AM
Crew briefing, radios out, walk the room

Owner

7:00 AM
Show caller

AV and materials

7:00 AM
Radios, printed run of show

Cue

7:00 AM
Show caller says go

Backup

7:00 AM
Text thread if radios fail

Status

7:00 AM
Confirmed
View full comparison table

Scroll sideways to compare all options →

Run of show template with ten columns, checked on November 19, 2026
TimeDurationSegmentLocationWhat happensOwnerAV and materialsCueBackupStatus
7:00 AM30 minCrew callMain roomCrew briefing, radios out, walk the roomShow callerRadios, printed run of showShow caller says goText thread if radios failConfirmed

What goes in each column:

  • Time is the clock time the row starts, never a range. Ranges hide who is late.
  • Duration is in minutes, so a change in one row shows what moves after it.
  • Segment is a short name the whole crew uses on the radio, like "Walk-in" or "Flip to breakouts".
  • Location is the room, entrance or pickup point, named as the venue names it.
  • What happens is one sentence that someone new could act on.
  • Owner is one named person with a phone number in the contact sheet.
  • AV and materials lists mics, slides, clickers, signage, printed items or props.
  • Cue is the trigger: a time, a line from the speaker, or a call from the show caller.
  • Backup is the plan if this row fails: a spare mic, an indoor room, a second driver.
  • Status is draft, confirmed or changed, so readers see which rows moved since the last version.

A cascading time formula helps in a spreadsheet: each start time equals the previous start plus its duration. Then one late row shifts the whole day on screen.

Filled example: a sales kickoff general session

An SKO morning needs more rows than the agenda suggests, because every stage moment has a crew action behind it.

This illustrative example covers a general session morning at a hotel ballroom. Times are illustrative; adapt them to your venue and the sales kickoff agenda you already have.

Duration

6:45 AM
30 min
7:15 AM
30 min
7:30 AM
60 min
8:20 AM
10 min
8:30 AM
5 min
8:35 AM
25 min
9:00 AM
15 min
9:15 AM
10 min
9:25 AM
15 min
11:40 AM
20 min
12:00 PM
60 min

Segment

6:45 AM
Crew call
7:15 AM
Tech check
7:30 AM
Breakfast and badges
8:20 AM
Walk-in
8:30 AM
Housekeeping
8:35 AM
CRO opening
9:00 AM
Award moment
9:15 AM
Buffer
9:25 AM
Flip to breakouts
11:40 AM
Lunch call
12:00 PM
Lunch

Location

6:45 AM
Ballroom
7:15 AM
Ballroom stage
7:30 AM
Foyer
8:20 AM
Ballroom
8:30 AM
Ballroom stage
8:35 AM
Ballroom stage
9:00 AM
Ballroom stage
9:15 AM
Ballroom
9:25 AM
Foyer and breakout rooms
11:40 AM
Breakout rooms
12:00 PM
Terrace or foyer

What happens

6:45 AM
Crew briefing, radios, run of show printouts, walk the room
7:15 AM
Mics, confidence monitor, clicker and slide deck test
7:30 AM
Badge pickup and buffet open
8:20 AM
Doors open, walk-in music, holding slide
8:30 AM
Wi-Fi, exits, schedule changes
8:35 AM
Year review and the plan for the year ahead
9:00 AM
Top rep award, photo on stage
9:15 AM
Absorbs any overrun before the flip
9:25 AM
Directions on screen, staff at doors, rooms open
11:40 AM
Five-minute warning, then release to lunch
12:00 PM
Buffet open, dietary table labeled

Owner

6:45 AM
Show caller
7:15 AM
AV lead
7:30 AM
Registration lead
8:20 AM
AV lead
8:30 AM
Host
8:35 AM
CRO, with chief of staff
9:00 AM
Field marketing lead
9:15 AM
Show caller
9:25 AM
Venue events manager
11:40 AM
Facilitators
12:00 PM
Venue banquet captain

AV and materials

6:45 AM
Radios, printouts
7:15 AM
Lav and handheld mics, clicker
7:30 AM
Badges, lanyards, signage
8:20 AM
Playlist, holding slide
8:30 AM
Handheld mic
8:35 AM
Lav mic, deck v3
9:00 AM
Award, walk-up music, photographer
9:15 AM
None
9:25 AM
Signage, room list on screen
11:40 AM
Timer cards
12:00 PM
Dietary cards

Cue

6:45 AM
Show caller
7:15 AM
Show caller
7:30 AM
Doors at 7:30
8:20 AM
Show caller: doors
8:30 AM
Lights to stage
8:35 AM
Host intro line
9:00 AM
CRO says the winner's name
9:15 AM
Show caller
9:25 AM
Host send-off line
11:40 AM
Show caller at 11:40
12:00 PM
Venue confirms ready

Backup

6:45 AM
Text thread
7:15 AM
Spare handheld mic
7:30 AM
Second badge table
8:20 AM
Music from laptop
8:30 AM
Host reads from card
8:35 AM
Deck on second laptop
9:00 AM
Photo after the session
9:15 AM
Cut housekeeping recap
9:25 AM
Staff walk groups
11:40 AM
Release by room
12:00 PM
Indoor foyer if rain

Status

6:45 AM
Confirmed
7:15 AM
Confirmed
7:30 AM
Confirmed
8:20 AM
Confirmed
8:30 AM
Confirmed
8:35 AM
Changed
9:00 AM
Confirmed
9:15 AM
Confirmed
9:25 AM
Confirmed
11:40 AM
Draft
12:00 PM
Confirmed
View full comparison table

Scroll sideways to compare all options →

Illustrative example: sales kickoff general session morning, checked on November 19, 2026
TimeDurationSegmentLocationWhat happensOwnerAV and materialsCueBackupStatus
6:45 AM30 minCrew callBallroomCrew briefing, radios, run of show printouts, walk the roomShow callerRadios, printoutsShow callerText threadConfirmed
7:15 AM30 minTech checkBallroom stageMics, confidence monitor, clicker and slide deck testAV leadLav and handheld mics, clickerShow callerSpare handheld micConfirmed
7:30 AM60 minBreakfast and badgesFoyerBadge pickup and buffet openRegistration leadBadges, lanyards, signageDoors at 7:30Second badge tableConfirmed
8:20 AM10 minWalk-inBallroomDoors open, walk-in music, holding slideAV leadPlaylist, holding slideShow caller: doorsMusic from laptopConfirmed
8:30 AM5 minHousekeepingBallroom stageWi-Fi, exits, schedule changesHostHandheld micLights to stageHost reads from cardConfirmed
8:35 AM25 minCRO openingBallroom stageYear review and the plan for the year aheadCRO, with chief of staffLav mic, deck v3Host intro lineDeck on second laptopChanged
9:00 AM15 minAward momentBallroom stageTop rep award, photo on stageField marketing leadAward, walk-up music, photographerCRO says the winner's namePhoto after the sessionConfirmed
9:15 AM10 minBufferBallroomAbsorbs any overrun before the flipShow callerNoneShow callerCut housekeeping recapConfirmed
9:25 AM15 minFlip to breakoutsFoyer and breakout roomsDirections on screen, staff at doors, rooms openVenue events managerSignage, room list on screenHost send-off lineStaff walk groupsConfirmed
11:40 AM20 minLunch callBreakout roomsFive-minute warning, then release to lunchFacilitatorsTimer cardsShow caller at 11:40Release by roomDraft
12:00 PM60 minLunchTerrace or foyerBuffet open, dietary table labeledVenue banquet captainDietary cardsVenue confirms readyIndoor foyer if rainConfirmed

For the wider production list, see the SKO production checklist for field marketing. For a full plan with venues and timings, browse a sample sales kickoff plan, or start from the sales kickoff planning hub.

Filled example: a one-day company offsite

An offsite day breaks at the transfers and the outdoor block, so those rows carry the backups.

This illustrative example follows a team of about forty: a coach from the office, a morning workshop, lunch, an outdoor activity with a weather backup, dinner and the ride home.

Duration

7:45 AM
15 min
8:00 AM
15 min
8:15 AM
75 min
9:30 AM
15 min
9:45 AM
120 min
11:45 AM
15 min
12:00 PM
60 min
1:15 PM
120 min
3:15 PM
30 min
4:00 PM
60 min
5:00 PM
120 min
7:15 PM
75 min

Segment

7:45 AM
Coach arrival
8:00 AM
Boarding
8:15 AM
Transfer
9:30 AM
Arrival buffer
9:45 AM
Strategy workshop
11:45 AM
Room reset
12:00 PM
Lunch
1:15 PM
Outdoor activity
3:15 PM
Wrap-up
4:00 PM
Free time
5:00 PM
Dinner
7:15 PM
Transfer home

Location

7:45 AM
Office pickup point
8:00 AM
Office pickup point
8:15 AM
Coach
9:30 AM
Venue lobby
9:45 AM
Meeting room
11:45 AM
Meeting room
12:00 PM
Terrace
1:15 PM
Grounds
3:15 PM
Meeting room
4:00 PM
Venue
5:00 PM
Private dining room
7:15 PM
Coach

What happens

7:45 AM
Coach parks, driver checks in with the host
8:00 AM
Head count against the list, bags stowed
8:15 AM
Drive to the venue; host shares the day plan
9:30 AM
Coffee, restrooms, settle in
9:45 AM
Facilitated session with two short breaks
11:45 AM
Venue clears for lunch; team walks to terrace
12:00 PM
Buffet lunch, dietary table labeled
1:15 PM
Guided team activity in small groups
3:15 PM
Decisions recap and next steps
4:00 PM
Rest, calls, bags back to the coach
5:00 PM
Seated dinner, short thank-you from the CEO
7:15 PM
Head count, drive back to the office

Owner

7:45 AM
Transport lead
8:00 AM
Transport lead
8:15 AM
Host
9:30 AM
Venue events manager
9:45 AM
Facilitator
11:45 AM
Venue banquet captain
12:00 PM
Venue banquet captain
1:15 PM
Activity provider
3:15 PM
Chief of staff
4:00 PM
Host
5:00 PM
Venue banquet captain
7:15 PM
Transport lead

AV and materials

7:45 AM
Passenger list
8:00 AM
Passenger list, water
8:15 AM
Coach mic if fitted
9:30 AM
Coffee station
9:45 AM
Screen, flip charts, markers
11:45 AM
None
12:00 PM
Dietary cards
1:15 PM
Safety briefing, gear
3:15 PM
Screen
4:00 PM
None
5:00 PM
Handheld mic
7:15 PM
Passenger list

Cue

7:45 AM
Driver call
8:00 AM
Head count complete
8:15 AM
Doors closed
9:30 AM
Coach arrival
9:45 AM
Host intro
11:45 AM
Facilitator closes
12:00 PM
Venue confirms ready
1:15 PM
Weather call at 11:00
3:15 PM
Activity ends
4:00 PM
Host
5:00 PM
Venue confirms ready
7:15 PM
Head count complete

Backup

7:45 AM
Second coach company on file
8:00 AM
Late joiners take a car
8:15 AM
Call venue if delayed
9:30 AM
Shorten if early
9:45 AM
Printed slides if screen fails
11:45 AM
Lunch indoors
12:00 PM
Indoor dining room
1:15 PM
Indoor workshop room
3:15 PM
Recap at dinner
4:00 PM
None
5:00 PM
Terrace if room overruns
7:15 PM
Cars for early leavers

Status

7:45 AM
Confirmed
8:00 AM
Confirmed
8:15 AM
Confirmed
9:30 AM
Confirmed
9:45 AM
Confirmed
11:45 AM
Confirmed
12:00 PM
Confirmed
1:15 PM
Changed
3:15 PM
Draft
4:00 PM
Confirmed
5:00 PM
Draft
7:15 PM
Confirmed
View full comparison table

Scroll sideways to compare all options →

Illustrative example: one-day company offsite with a transfer, checked on November 19, 2026
TimeDurationSegmentLocationWhat happensOwnerAV and materialsCueBackupStatus
7:45 AM15 minCoach arrivalOffice pickup pointCoach parks, driver checks in with the hostTransport leadPassenger listDriver callSecond coach company on fileConfirmed
8:00 AM15 minBoardingOffice pickup pointHead count against the list, bags stowedTransport leadPassenger list, waterHead count completeLate joiners take a carConfirmed
8:15 AM75 minTransferCoachDrive to the venue; host shares the day planHostCoach mic if fittedDoors closedCall venue if delayedConfirmed
9:30 AM15 minArrival bufferVenue lobbyCoffee, restrooms, settle inVenue events managerCoffee stationCoach arrivalShorten if earlyConfirmed
9:45 AM120 minStrategy workshopMeeting roomFacilitated session with two short breaksFacilitatorScreen, flip charts, markersHost introPrinted slides if screen failsConfirmed
11:45 AM15 minRoom resetMeeting roomVenue clears for lunch; team walks to terraceVenue banquet captainNoneFacilitator closesLunch indoorsConfirmed
12:00 PM60 minLunchTerraceBuffet lunch, dietary table labeledVenue banquet captainDietary cardsVenue confirms readyIndoor dining roomConfirmed
1:15 PM120 minOutdoor activityGroundsGuided team activity in small groupsActivity providerSafety briefing, gearWeather call at 11:00Indoor workshop roomChanged
3:15 PM30 minWrap-upMeeting roomDecisions recap and next stepsChief of staffScreenActivity endsRecap at dinnerDraft
4:00 PM60 minFree timeVenueRest, calls, bags back to the coachHostNoneHostNoneConfirmed
5:00 PM120 minDinnerPrivate dining roomSeated dinner, short thank-you from the CEOVenue banquet captainHandheld micVenue confirms readyTerrace if room overrunsDraft
7:15 PM75 minTransfer homeCoachHead count, drive back to the officeTransport leadPassenger listHead count completeCars for early leaversConfirmed

The weather call sits in the cue column, two hours before the activity, so the backup room is ready in time.

The evening before, run the day-before runbook for company offsites against this sheet. If the offsite is your first, our company offsite planning page shows the full process.

How to build the run of show from your agenda

Start from the locked agenda, then break every block into the actions behind it.

  1. Copy the agenda times into the template, one row per block.
  2. Under each block, add the rows that happen before and after it: setup, walk-in, introductions, handoffs and resets.
  3. Name one owner per row, using people the venue and crew can reach on the day.
  4. Ask the venue for its banquet event order and match meal times, room names and setup times to it.
  5. Ask the AV team which cues they need from you, then add them to the cue column.
  6. Add buffers and transfers as rows with their own times.
  7. Fill the backup column for anything outdoors, on stage or on the road.
  8. Walk the sheet with each owner and mark rows confirmed.

For a conference format with several tracks, the conference agenda template shows how sessions stack before you break them down.

Buffers, room flips and transfers

Give buffers, flips and transfers their own rows, because padding hidden inside sessions gets eaten by the first speaker.

  • A buffer row has a time, a length and a cut plan, so the show caller knows what to drop if it runs out.
  • A room flip row names the venue staff, the target layout and the time the room must be ready.
  • A transfer row carries the pickup point, the head count step and a backup vehicle.
  • A meal call row warns the kitchen ahead of time, so food lands when people do.

On multi-day events, add a short reset row at the start and end of each day. That is when signage moves, rooms change and the crew briefs again.

Who gets which version, and when to lock it

Draft about a month out, lock two or three days before, and print the version date in the header.

  • About four weeks out: first full draft shared with the event planner and the venue.
  • About two weeks out: AV and speaker cues added; the venue matches its own timeline to yours.
  • Two or three days out: lock it. Changes after this point go through the show caller only.
  • Day before: print copies for the crew and save a PDF on every owner's phone.
  • On the day: mark changes in the status column and announce them on the radio.

Use one file name pattern, such as "Run of show, SKO day 1, v4, locked Nov 12". Old versions go to an archive folder so nobody opens the wrong one.

Attendees never see the run of show. They get the agenda, and leadership gets a one-page summary of key times.

On the day: calling the show

One show caller runs the day from the sheet; everyone else acts on their cues.

  • Pick the show caller ahead of time. It can be the event planner, the venue events manager or you.
  • Hold a short crew briefing at the first row of each day.
  • Give standby calls before each cue, then a clear go.
  • Keep one channel for changes, radio or a group thread, never both.
  • Note what ran over and why, for the debrief.

Small leadership days work the same way, with fewer rows. The board day runbook for EAs shows a lighter version.

Mistakes that break a run of show

  • Sending the attendee agenda to the crew instead of a run of show.
  • Owners listed as "AV" or "venue" rather than a person.
  • No transfer rows, so coaches leave late and the first session starts late.
  • Outdoor blocks with no backup room and no time for the weather call.
  • Several live versions in inboxes, with no lock date.
  • Speakers changing decks after the lock, without telling the AV desk.

When a local planner helps

If you have never run an event, a local event planner can turn your agenda into venues, timings and a run of show.

That is useful when the offsite is in a city you do not know, or abroad. No event experience is needed on your side.

Send a short brief: dates, headcount, city or region, the agenda you have and anything that needs a backup, such as an outdoor activity.

Vantly matches that brief with a local planner, who produces a turnkey event proposal with prices. We send it within 48 hours, at no cost. Any price still waiting on a vendor's confirmation is marked as an estimate.

From there, your local planner handles the venues and vendors, and you deal only with Vantly instead of many small vendors, with clear, structured invoices that are easy to reconcile.

You get local prices with no agency markup, and every proposal is reviewed by Vantly before you see it.

Frequently asked questions

What is the difference between a run of show and an agenda?

The agenda tells attendees where to be and when. The run of show tells the crew what to do at each moment, who does it and what the backup is. Attendees should only ever see the agenda.

Who should own the run of show?

One person owns the file and its versions, usually the event lead or the event planner. On the day, one show caller runs it. Every row still has its own named owner.

How detailed should a run of show be?

Detailed enough that someone new could step in. That usually means one row per action, timed to the minute, with a cue and a backup for anything on stage, outdoors or on the road.

When should I send the run of show to the venue?

Share a first draft about a month out so the venue can match its own timeline, and send the locked version two or three days before the event.

Should I use Excel or Google Sheets for a run of show?

Either works. A shared sheet makes updates easier while you plan, and a dated PDF export is safer on the day, when Wi-Fi may be weak.

Can a local event planner build the run of show for me?

Yes. A local planner can take your agenda and headcount and turn them into venues, timings and a run of show, then run it with the venue on the day.